Deck plate 1 페이지

본문 바로가기

사이트 내 전체검색

KOR | ENG

Deck plate

Deck plate

Cost and environmental formwork minimization method required

  • Although the formwork is a necessary element in the construction method using concrete, it is desirable to minimize it to reduce manpower and cost, reduce air, and improve the working environment. It is a method of minimizing on-site formwork production using harmless formwork in the UK.

WINHI_BEAM Top 5 Excellence

  • WINHI_BEAM has five qualities: economic feasibility, construction convenience, safety, high quality, and eco-friendliness. When WINHI_BEAM is applied, it is easy to manage the site by drastically reducing on-site personnel, reducing safety management costs, omitting the process of dismantling and organizing the beam form and minimizing the temporary materials, shortening the absolute process through the pre-production of the customized formwork, reducing the generation of waste, noise, and dust, as well as ensuring high quality construction quality.

The New Paradigm Harmless Body Formation of the Beam Formation

  • 1. WINHI_BEAM serves as a formwork for concrete pouring and is a non-damaging beamform that is precisely manufactured in an automated process facility and does not permanently remove the formwork after installation.
  • 2. It is a system that pre-manufactures 1.0T of zinc iron plate from a factory to a forming line into a plate with temporary material structure performance, and then can be installed directly on site through an assembly process.
(주)디오산업 | CEO : Song Young-min | Business number : 128-86-61518
Tel : +82 31-907-1095 | Fax : +82 31-907-1096 | Mobile : +82 10-5547-1095
Addresss : 3-8, Dongheon-ro 307beon-gil, Deogyang-gu, Goyang-si, Gyeonggi-do (620 Daeja-dong, Deogyang-gu)
Copyright © (주)디오산업. All rights reserved.